Solar PV in Chudleigh
Prices Illustrative
Range £5,250–£9,980 · Devon avg £6,800
Solar PV in Chudleigh typically costs £7,145, with most jobs between £5,250 and £9,980, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 6 days. Prices include testing and certificate.

PD Electrical
Solar PV across Chudleigh and TQ13. Fixed price after a free survey.
Recent solar pv jobs near Chudleigh

Solar PV for a terraced house, tested and certified same visit.
Oct 2026

Solar PV in a 1970s bungalow, including minor remedial work.
Aug 2026

Solar PV for a rented flat, landlord met on site.
Jun 2026
Solar PV in Chudleigh: key facts
- Typical price £7,145
- Range £5,250–£9,980
- 1–2 days on site
- Next slot: 6 days
- 3 local electricians
- Prices Illustrative
Where work has recently been completed around Chudleigh
Prices IllustrativeWhat Chudleigh customers typically pay
Download CSVMethod: illustrative 2026 prices for solar pv within 10 miles of Chudleigh, grouped in £500 bands. Prices include VAT, testing and certificate.
How Chudleigh compares
| Area | Typical | Range | Next slot |
|---|---|---|---|
| Chudleigh | £7,145 | £5,250–£9,980 | 6 days |
| Bovey Tracey | £7,460 | £5,485–£10,425 | 6 days |
| Kingsteignton | £7,305 | £5,370–£10,205 | 2 days |
| Devon average | £6,800 | £5,000–£9,500 | 4 days |
| UK average | £7,750 | £5,500–£11,400 | 6 days |
What happens on the day
- Day 1 08:00Arrive & survey
Walk-round, agree cable routes and protect floors.
- Day 1 09:00Isolate
Supply switched off; temporary power set up if needed.
- Day 1–2First fix
Cables, mounts and containment installed.
- Day 2–3Second fix
Fittings, panels or units connected.
- Final dayTest
Full tests to BS 7671; results recorded.
- HandoverCertificate
EIC issued, Part P notified to Teignbridge District Council building control.
Chudleigh local facts
checked 29 October 2026| Council | Teignbridge District Council handles building control for Chudleigh. | GOV.UK |
|---|---|---|
| Network operator | National Grid (South West) runs the local network. Power cuts: call 105. | National Grid |
| Housing | Market-town terraces and 1960s–90s estates. | ONS Census 2021 |
| Coastal | Inland: standard outdoor fittings are usually fine. | Met Office |
| Regulations | Fuse box, rewire and new circuits are notifiable under Part P. | GOV.UK |
What Chudleigh customers say
32 reviews“Turned up when they said, solar pv done and tested in 1–2 days. Price matched the quote.”
— Customer, Mill Lane, Chudleigh · Sep 2026
How much does solar pv cost in Chudleigh?
Solar PV in Chudleigh typically costs £7,145, with most jobs between £5,250 and £9,980, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 6 days. Prices include testing and certificate.
How long does solar pv take in Chudleigh?
Usually 1–2 days on site. Larger homes or older wiring can add a day.
How soon can an electrician come out in Chudleigh?
The next available slot near TQ13 is in 6 days. 3 electricians cover Chudleigh.
Is solar worth it in Chudleigh?
Devon gets some of the best sunshine in the UK, so yes for most south, east or west-facing roofs. A typical 4 kWp system in Chudleigh costs £7,145 and makes around 3,500 to 4,000 kWh a year. Most households see payback in 8 to 12 years, quicker with a battery.
I'm off mains gas near Chudleigh. Is going electric worth it?
Often, if you pair it with a cheap night tariff or solar. Modern storage heaters and heat pumps beat old oil boilers on running costs for a lot of homes around Chudleigh. A typical solar pv here is £7,145. Get a quote that includes the tariff advice.
Do I need planning permission for solar panels in Chudleigh?
Usually not, as roof panels are permitted development. You do need permission for listed buildings, and you may need it in conservation areas if panels face the road. Check with Teignbridge District Council first if your home is in either.
Do I need consent for solar pv in a listed building in Chudleigh?
If the work changes the building's character, yes, you need listed building consent from Teignbridge District Council. New cable routes through old plaster, visible kit on the front and roof panels are the usual triggers. Like-for-like repairs usually don't. Ask the conservation officer first; it's free.
Which areas near Chudleigh do you cover for solar pv?
We list electricians working across Chudleigh and nearby spots like Ashcombe and Chudleigh Knighton, covering TQ13. Homes here are mostly stone and rendered town houses with newer estates. A typical job costs £7,145 on our illustrative local prices.
How do Chudleigh prices for solar pv compare with Bovey Tracey?
Chudleigh typically comes in at £7,145 and Bovey Tracey at £7,460, with Devon as a whole around £6,800. The gap is mostly down to property type and travel, so a quote from a firm in either town is worth having.
Can I get paid for the electricity I export?
Yes, through the Smart Export Guarantee. You'll need an MCS certificate from your installer and a smart meter. Rates vary a lot between suppliers, so shop around once the system's in.
Who signs off solar pv work in Chudleigh?
Your electrician, if they're on a scheme like NICEIC. They test the work, issue an Electrical Installation Certificate and notify Teignbridge District Council building control. Hiring someone who isn't registered means paying the council to inspect it, which costs far more.
Do you cover the villages round Chudleigh, like Ashcombe and Chudleigh Knighton?
We do. The solar pv prices on this page already include jobs in Ashcombe, Chudleigh Knighton, Trusham, Christow, Ideford, Kennford. Village visits are usually booked on the same days as Chudleigh work, so the next slot (in 6 days) normally applies to you too.
Who looks after the cable into my house in Chudleigh?
National Grid (South West) owns the supply cable, the main fuse and the cutout in TQ13. Your electrician can't touch those. If the cutout is cracked, scorched or old, they'll report it, and National Grid (South West) usually replaces it free.
Who do I call in a power cut in Chudleigh?
National Grid (South West) runs the network here. If the whole street is dark, call 105, it's free and they'll give you a time. If it's only your house, check your trip switches first, then call an electrician.
- Bovey Tracey3.4 mi · £7,460
- Kingsteignton3.9 mi · £7,305
- Newton Abbot5.2 mi · £6,910
- Teignmouth6.1 mi · £6,340
- Dawlish6.1 mi · £7,280
- Battery storagefrom £3,675
- EV charger installationfrom £895
- Fuse box replacementfrom £475
- Illustrative prices refreshed for 2026.
- Added job map and price chart.
- Page first published.