Solar PV in Ivybridge
Prices Illustrative
Range £5,215–£9,915 · Devon avg £6,800
Solar PV in Ivybridge typically costs £7,095, with most jobs between £5,215 and £9,915, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 2 days. Prices include testing and certificate.

PD Electrical
Solar PV across Ivybridge and PL21. Fixed price after a free survey.
Recent solar pv jobs near Ivybridge

Solar PV for a terraced house, tested and certified same visit.
Oct 2026

Solar PV in a 1970s bungalow, including minor remedial work.
Aug 2026

Solar PV for a rented flat, landlord met on site.
Jun 2026
Solar PV in Ivybridge: key facts
- Typical price £7,095
- Range £5,215–£9,915
- 1–2 days on site
- Next slot: 2 days
- 7 local electricians
- Prices Illustrative
Where work has recently been completed around Ivybridge
Prices IllustrativeWhat Ivybridge customers typically pay
Download CSVMethod: illustrative 2026 prices for solar pv within 10 miles of Ivybridge, grouped in £500 bands. Prices include VAT, testing and certificate.
How Ivybridge compares
| Area | Typical | Range | Next slot |
|---|---|---|---|
| Ivybridge | £7,095 | £5,215–£9,915 | 2 days |
| Buckfastleigh | £6,660 | £4,895–£9,305 | 5 days |
| Kingsbridge | £7,160 | £5,265–£10,005 | 4 days |
| Devon average | £6,800 | £5,000–£9,500 | 4 days |
| UK average | £7,750 | £5,500–£11,400 | 6 days |
What happens on the day
- Day 1 08:00Arrive & survey
Walk-round, agree cable routes and protect floors.
- Day 1 09:00Isolate
Supply switched off; temporary power set up if needed.
- Day 1–2First fix
Cables, mounts and containment installed.
- Day 2–3Second fix
Fittings, panels or units connected.
- Final dayTest
Full tests to BS 7671; results recorded.
- HandoverCertificate
EIC issued, Part P notified to South Hams District Council building control.
Ivybridge local facts
checked 29 October 2026| Council | South Hams District Council handles building control for Ivybridge. | GOV.UK |
|---|---|---|
| Network operator | National Grid (South West) runs the local network. Power cuts: call 105. | National Grid |
| Housing | Market-town terraces and 1960s–90s estates. | ONS Census 2021 |
| Coastal | Inland: standard outdoor fittings are usually fine. | Met Office |
| Regulations | Fuse box, rewire and new circuits are notifiable under Part P. | GOV.UK |
What Ivybridge customers say
14 reviews“Turned up when they said, solar pv done and tested in 1–2 days. Price matched the quote.”
— Customer, Station Road, Ivybridge · Sep 2026
How much does solar pv cost in Ivybridge?
Solar PV in Ivybridge typically costs £7,095, with most jobs between £5,215 and £9,915, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 2 days. Prices include testing and certificate.
How long does solar pv take in Ivybridge?
Usually 1–2 days on site. Larger homes or older wiring can add a day.
How soon can an electrician come out in Ivybridge?
The next available slot near PL21 is in 2 days. 7 electricians cover Ivybridge.
Is solar worth it in Ivybridge?
Devon gets some of the best sunshine in the UK, so yes for most south, east or west-facing roofs. A typical 4 kWp system in Ivybridge costs £7,095 and makes around 3,500 to 4,000 kWh a year. Most households see payback in 8 to 12 years, quicker with a battery.
Which areas near Ivybridge do you cover for solar pv?
We list electricians working across Ivybridge and nearby spots like Ermington and Cornwood, covering PL21. Homes here are mostly mostly 1970s onwards estates on the edge of the moor. A typical job costs £7,095 on our illustrative local prices.
Do electricians charge more to come out on the moor near Ivybridge?
A little, sometimes. Ivybridge is on the edge of Dartmoor National Park, and homes up on the moor can be a long drive with poor phone signal. Most firms add £20 to £40 for remote spots. In town, the £7,095 typical price stands.
Who signs off solar pv work in Ivybridge?
Your electrician, if they're on a scheme like NICEIC. They test the work, issue an Electrical Installation Certificate and notify South Hams District Council building control. Hiring someone who isn't registered means paying the council to inspect it, which costs far more.
Do you cover the villages round Ivybridge, like Ermington and Cornwood?
We do. The solar pv prices on this page already include jobs in Ermington, Cornwood, Bittaford, Modbury, Lee Mill. Village visits are usually booked on the same days as Ivybridge work, so the next slot (in 2 days) normally applies to you too.
Do I need planning for solar pv in Dartmoor National Park near Ivybridge?
Usually not for a normal home, but the rules are tighter in a National Park. Kit on a wall facing the road, ground-mounted panels and anything on a listed building can need consent. Check with Dartmoor National Park Authority planning before you book, not after.
Do I need planning permission for solar panels in Ivybridge?
Usually not, as roof panels are permitted development. You do need permission for listed buildings, and you may need it in conservation areas if panels face the road. Check with South Hams District Council first if your home is in either.
Can I get paid for the electricity I export?
Yes, through the Smart Export Guarantee. You'll need an MCS certificate from your installer and a smart meter. Rates vary a lot between suppliers, so shop around once the system's in.
How do Ivybridge prices for solar pv compare with Buckfastleigh?
Ivybridge typically comes in at £7,095 and Buckfastleigh at £6,660, with Devon as a whole around £6,800. The gap is mostly down to property type and travel, so a quote from a firm in either town is worth having.
Who looks after the cable into my house in Ivybridge?
National Grid (South West) owns the supply cable, the main fuse and the cutout in PL21. Your electrician can't touch those. If the cutout is cracked, scorched or old, they'll report it, and National Grid (South West) usually replaces it free.
Who do I call in a power cut in Ivybridge?
National Grid (South West) runs the network here. If the whole street is dark, call 105, it's free and they'll give you a time. If it's only your house, check your trip switches first, then call an electrician.
- Buckfastleigh8.9 mi · £6,660
- Kingsbridge9.7 mi · £7,160
- Plymouth9.8 mi · £7,070
- Totnes10.8 mi · £7,025
- Ashburton11.3 mi · £7,330
- Battery storagefrom £3,650
- EV charger installationfrom £885
- Fuse box replacementfrom £470
- Illustrative prices refreshed for 2026.
- Added job map and price chart.
- Page first published.