Devon Electricians Direct

Solar PV in South Molton

Prices Illustrative

Typical South Molton price
£7,130

Range £5,245–£9,965 · Devon avg £6,800

Solar PV in South Molton typically costs £7,130, with most jobs between £5,245 and £9,965, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 8 days. Prices include testing and certificate.

Typical price
£7,130
Time on site
1–2 days
Next slot
8 days
Local electricians
4

Other South Molton electricians

Independent ranking · reviews, local jobs, response time
1
Cook Electrical Ltd
Near Barnstaple · 9.3 mi · Registration not checked
Rating not checkedUnverified
Prices not published
Local typical £5,245–£9,965
Ask for a quote
2
Edwards Electrical Ltd
Barnstaple · 10.7 mi · NICEIC
Rating not checkedUnverified
Prices not published
Local typical £5,245–£9,965
Ask for a quote
3
J Thompson Electrical Contractors
Barnstaple · 10.7 mi · Registration not checked
Rating not checkedUnverified
Prices not published
Local typical £5,245–£9,965
Ask for a quote
4
Barritt Electrical
Bideford · 16.2 mi · NICEIC
Rating not checkedUnverified
Prices not published
Local typical £5,245–£9,965
Ask for a quote

Recent solar pv jobs near South Molton

Solar PV job in North Molton, South Molton, Devon
North Molton EX36 6£8,975

Solar PV for a terraced house, tested and certified same visit.

Oct 2026

Solar PV job in Bishop's Nympton, South Molton, Devon
Bishop's Nympton EX36 6£6,015

Solar PV in a 1970s bungalow, including minor remedial work.

Aug 2026

Solar PV job in Filleigh, South Molton, Devon
Filleigh EX32 6£9,660

Solar PV for a rented flat, landlord met on site.

Jun 2026

Solar PV in South Molton: key facts

  • Typical price £7,130
  • Range £5,245–£9,965
  • 1–2 days on site
  • Next slot: 8 days
  • 4 local electricians
  • Prices Illustrative

Where work has recently been completed around South Molton

Prices Illustrative
  • Solar PV
  • Other jobs
  • Emergencies
AreaPostcodeDistance
North MoltonEX36 62.9 mi
Bishop's NymptonEX36 63.0 mi
FilleighEX32 63.5 mi
ChittlehamptonEX37 34.9 mi
King's NymptonEX37 14.4 mi

What South Molton customers typically pay

Download CSV
£5,000£10,000

Method: illustrative 2026 prices for solar pv within 10 miles of South Molton, grouped in £500 bands. Prices include VAT, testing and certificate.

How South Molton compares

AreaTypicalRangeNext slot
South Molton£7,130£5,245–£9,9658 days
Barnstaple£7,130£5,245–£9,9605 days
Great Torrington£7,510£5,525–£10,49510 days
Devon average£6,800£5,000–£9,5004 days
UK average£7,750£5,500–£11,4006 days

What happens on the day

South Molton local facts

checked 29 October 2026
CouncilNorth Devon Council handles building control for South Molton.GOV.UK
Network operatorNational Grid (South West) runs the local network. Power cuts: call 105.National Grid
HousingMarket-town terraces and 1960s–90s estates.ONS Census 2021
CoastalInland: standard outdoor fittings are usually fine.Met Office
RegulationsFuse box, rewire and new circuits are notifiable under Part P.GOV.UK

What South Molton customers say

37 reviews
4.7
★★★★★
On timeTidyFixed price keptExplained clearly
“Turned up when they said, solar pv done and tested in 1–2 days. Price matched the quote.”

— Customer, Chapel Street, South Molton · Sep 2026

Solar PV in South Molton — answered

How much does solar pv cost in South Molton?

Solar PV in South Molton typically costs £7,130, with most jobs between £5,245 and £9,965, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 8 days. Prices include testing and certificate.

How long does solar pv take in South Molton?

Usually 1–2 days on site. Larger homes or older wiring can add a day.

How soon can an electrician come out in South Molton?

The next available slot near EX36 is in 8 days. 4 electricians cover South Molton.

Is solar worth it in South Molton?

Devon gets some of the best sunshine in the UK, so yes for most south, east or west-facing roofs. A typical 4 kWp system in South Molton costs £7,130 and makes around 3,500 to 4,000 kWh a year. Most households see payback in 8 to 12 years, quicker with a battery.

Who signs off solar pv work in South Molton?

Your electrician, if they're on a scheme like NICEIC. They test the work, issue an Electrical Installation Certificate and notify North Devon Council building control. Hiring someone who isn't registered means paying the council to inspect it, which costs far more.

Who looks after the cable into my house in South Molton?

National Grid (South West) owns the supply cable, the main fuse and the cutout in EX36. Your electrician can't touch those. If the cutout is cracked, scorched or old, they'll report it, and National Grid (South West) usually replaces it free.

I'm off mains gas near South Molton. Is going electric worth it?

Often, if you pair it with a cheap night tariff or solar. Modern storage heaters and heat pumps beat old oil boilers on running costs for a lot of homes around South Molton. A typical solar pv here is £7,130. Get a quote that includes the tariff advice.

Can I get paid for the electricity I export?

Yes, through the Smart Export Guarantee. You'll need an MCS certificate from your installer and a smart meter. Rates vary a lot between suppliers, so shop around once the system's in.

How do South Molton prices for solar pv compare with Barnstaple?

South Molton typically comes in at £7,130 and Barnstaple at £7,130, with Devon as a whole around £6,800. The gap is mostly down to property type and travel, so a quote from a firm in either town is worth having.

Do you cover the villages round South Molton, like North Molton and Bishop's Nympton?

We do. The solar pv prices on this page already include jobs in North Molton, Bishop's Nympton, Filleigh, Chittlehampton, King's Nympton. Village visits are usually booked on the same days as South Molton work, so the next slot (in 8 days) normally applies to you too.

Do I need consent for solar pv in a listed building in South Molton?

If the work changes the building's character, yes, you need listed building consent from North Devon Council. New cable routes through old plaster, visible kit on the front and roof panels are the usual triggers. Like-for-like repairs usually don't. Ask the conservation officer first; it's free.

Do I need planning for solar pv in Exmoor National Park near South Molton?

Usually not for a normal home, but the rules are tighter in a National Park. Kit on a wall facing the road, ground-mounted panels and anything on a listed building can need consent. Check with Exmoor National Park Authority planning before you book, not after.

Do I need planning permission for solar panels in South Molton?

Usually not, as roof panels are permitted development. You do need permission for listed buildings, and you may need it in conservation areas if panels face the road. Check with North Devon Council first if your home is in either.

Who do I call in a power cut in South Molton?

National Grid (South West) runs the network here. If the whole street is dark, call 105, it's free and they'll give you a time. If it's only your house, check your trip switches first, then call an electrician.

Solar PV nearby
Often done with solar pv
What changed on this page
  • Illustrative prices refreshed for 2026.
  • Added job map and price chart.
  • Page first published.
Get quotes — free