Solar PV in Torquay
Prices Illustrative
Range £4,860–£9,240 · Devon avg £6,800
Solar PV in Torquay typically costs £6,615, with most jobs between £4,860 and £9,240, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 2 days. Prices include testing and certificate.

PD Electrical
Solar PV across Torquay and TQ1, TQ2. Fixed price after a free survey.
Recent solar pv jobs near Torquay

Solar PV for a terraced house, tested and certified same visit.
Oct 2026

Solar PV in a 1970s bungalow, including minor remedial work.
Aug 2026

Solar PV for a rented flat, landlord met on site.
Jun 2026
Solar PV in Torquay: key facts
- Typical price £6,615
- Range £4,860–£9,240
- 1–2 days on site
- Next slot: 2 days
- 27 local electricians
- Prices Illustrative
Where work has recently been completed around Torquay
Prices Illustrative- Solar PV
- Other jobs
- Emergencies
| Area | Postcode | Distance |
|---|---|---|
| Babbacombe | TQ1 5 | 1.2 mi |
| St Marychurch | TQ1 6 | 1.3 mi |
| Chelston | TQ2 3 | 1.1 mi |
| Wellswood | TQ1 3 | 0.9 mi |
| Barton | TQ2 7 | 2.4 mi |
| Shiphay | TQ2 4 | 1.9 mi |
What Torquay customers typically pay
Download CSVMethod: illustrative 2026 prices for solar pv within 10 miles of Torquay, grouped in £500 bands. Prices include VAT, testing and certificate.
How Torquay compares
| Area | Typical | Range | Next slot |
|---|---|---|---|
| Torquay | £6,615 | £4,860–£9,240 | 2 days |
| Paignton | £6,575 | £4,835–£9,185 | Tomorrow |
| Brixham | £7,045 | £5,180–£9,845 | Tomorrow |
| Devon average | £6,800 | £5,000–£9,500 | 4 days |
| UK average | £7,750 | £5,500–£11,400 | 6 days |
What happens on the day
- Day 1 08:00Arrive & survey
Walk-round, agree cable routes and protect floors.
- Day 1 09:00Isolate
Supply switched off; temporary power set up if needed.
- Day 1–2First fix
Cables, mounts and containment installed.
- Day 2–3Second fix
Fittings, panels or units connected.
- Final dayTest
Full tests to BS 7671; results recorded.
- HandoverCertificate
EIC issued, Part P notified to Torbay Council building control.
Torquay local facts
checked 29 October 2026| Council | Torbay Council handles building control for Torquay. | GOV.UK |
|---|---|---|
| Network operator | National Grid (South West) runs the local network. Power cuts: call 105. | National Grid |
| Housing | Mixed: Victorian terraces, post-war estates, new builds. | ONS Census 2021 |
| Coastal | Coastal: salt air shortens the life of outdoor fittings, so IP65+ is advised. | Met Office |
| Regulations | Fuse box, rewire and new circuits are notifiable under Part P. | GOV.UK |
What Torquay customers say
46 reviews“Turned up when they said, solar pv done and tested in 1–2 days. Price matched the quote.”
— Customer, Church Lane, Torquay · Sep 2026
How much does solar pv cost in Torquay?
Solar PV in Torquay typically costs £6,615, with most jobs between £4,860 and £9,240, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 2 days. Prices include testing and certificate.
How long does solar pv take in Torquay?
Usually 1–2 days on site. Larger homes or older wiring can add a day.
How soon can an electrician come out in Torquay?
The next available slot near TQ1, TQ2 is in 2 days. 27 electricians cover Torquay.
Is solar worth it in Torquay?
Devon gets some of the best sunshine in the UK, so yes for most south, east or west-facing roofs. A typical 4 kWp system in Torquay costs £6,615 and makes around 3,500 to 4,000 kWh a year. Most households see payback in 8 to 12 years, quicker with a battery.
How do Torquay prices for solar pv compare with Paignton?
Torquay typically comes in at £6,615 and Paignton at £6,575, with Devon as a whole around £6,800. The gap is mostly down to property type and travel, so a quote from a firm in either town is worth having.
Who looks after the cable into my house in Torquay?
National Grid (South West) owns the supply cable, the main fuse and the cutout in TQ1, TQ2. Your electrician can't touch those. If the cutout is cracked, scorched or old, they'll report it, and National Grid (South West) usually replaces it free.
Which areas near Torquay do you cover for solar pv?
We list electricians working across Torquay and nearby spots like Babbacombe and St Marychurch, covering TQ1, TQ2. Homes here are mostly Victorian villas split into flats, guest houses and terraces. A typical job costs £6,615 on our illustrative local prices.
Do solar panels and batteries cope with salt air in Torquay?
Panels are fine, but the fixings, isolators and inverters near the sea need care. Ask for marine-grade or stainless clamps and keep the inverter and battery indoors if you can. Close to the front in Torquay, get the system checked every couple of years.
Do I need consent for solar pv in a listed building in Torquay?
If the work changes the building's character, yes, you need listed building consent from Torbay Council. New cable routes through old plaster, visible kit on the front and roof panels are the usual triggers. Like-for-like repairs usually don't. Ask the conservation officer first; it's free.
Can I get paid for the electricity I export?
Yes, through the Smart Export Guarantee. You'll need an MCS certificate from your installer and a smart meter. Rates vary a lot between suppliers, so shop around once the system's in.
Do you cover the villages round Torquay, like Babbacombe and St Marychurch?
We do. The solar pv prices on this page already include jobs in Babbacombe, St Marychurch, Chelston, Wellswood, Barton, Shiphay. Village visits are usually booked on the same days as Torquay work, so the next slot (in 2 days) normally applies to you too.
Do I need planning permission for solar panels in Torquay?
Usually not, as roof panels are permitted development. You do need permission for listed buildings, and you may need it in conservation areas if panels face the road. Check with Torbay Council first if your home is in either.
Who signs off solar pv work in Torquay?
Your electrician, if they're on a scheme like NICEIC. They test the work, issue an Electrical Installation Certificate and notify Torbay Council building control. Hiring someone who isn't registered means paying the council to inspect it, which costs far more.
Who do I call in a power cut in Torquay?
National Grid (South West) runs the network here. If the whole street is dark, call 105, it's free and they'll give you a time. If it's only your house, check your trip switches first, then call an electrician.
- Paignton2.5 mi · £6,575
- Brixham4.7 mi · £7,045
- Newton Abbot5.9 mi · £6,910
- Teignmouth6.0 mi · £6,340
- Kingsteignton6.7 mi · £7,305
- Battery storagefrom £3,405
- EV charger installationfrom £825
- Fuse box replacementfrom £440
- Illustrative prices refreshed for 2026.
- Added job map and price chart.
- Page first published.