Solar PV in Exeter
Prices Illustrative
Range £4,885–£9,285 · Devon avg £6,800
Solar PV in Exeter typically costs £6,645, with most jobs between £4,885 and £9,285, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 3 days. Prices include testing and certificate.

PD Electrical
Solar PV across Exeter and EX1, EX2, EX3, EX4. Fixed price after a free survey.
Recent solar pv jobs near Exeter

Solar PV for a terraced house, tested and certified same visit.
Oct 2026

Solar PV in a 1970s bungalow, including minor remedial work.
Aug 2026

Solar PV for a rented flat, landlord met on site.
Jun 2026
Solar PV in Exeter: key facts
- Typical price £6,645
- Range £4,885–£9,285
- 1–2 days on site
- Next slot: 3 days
- 48 local electricians
- Prices Illustrative
Where work has recently been completed around Exeter
Prices Illustrative- Solar PV
- Other jobs
- Emergencies
| Area | Postcode | Distance |
|---|---|---|
| Heavitree | EX1 5 | 1.7 mi |
| St Thomas | EX4 7 | 0.5 mi |
| Pinhoe | EX4 6 | 2.9 mi |
| Alphington | EX2 6 | 1.3 mi |
| Pennsylvania | EX4 7 | 1.4 mi |
| Whipton | EX4 4 | 2.2 mi |
What Exeter customers typically pay
Download CSVMethod: illustrative 2026 prices for solar pv within 10 miles of Exeter, grouped in £500 bands. Prices include VAT, testing and certificate.
How Exeter compares
| Area | Typical | Range | Next slot |
|---|---|---|---|
| Exeter | £6,645 | £4,885–£9,285 | 3 days |
| Topsham | £6,655 | £4,895–£9,300 | 2 days |
| Cranbrook | £6,705 | £4,930–£9,365 | 2 days |
| Devon average | £6,800 | £5,000–£9,500 | 4 days |
| UK average | £7,750 | £5,500–£11,400 | 6 days |
What happens on the day
- Day 1 08:00Arrive & survey
Walk-round, agree cable routes and protect floors.
- Day 1 09:00Isolate
Supply switched off; temporary power set up if needed.
- Day 1–2First fix
Cables, mounts and containment installed.
- Day 2–3Second fix
Fittings, panels or units connected.
- Final dayTest
Full tests to BS 7671; results recorded.
- HandoverCertificate
EIC issued, Part P notified to Exeter City Council building control.
Exeter local facts
checked 29 October 2026| Council | Exeter City Council handles building control for Exeter. | GOV.UK |
|---|---|---|
| Network operator | National Grid (South West) runs the local network. Power cuts: call 105. | National Grid |
| Housing | Mixed: Victorian terraces, post-war estates, new builds. | ONS Census 2021 |
| Coastal | Inland: standard outdoor fittings are usually fine. | Met Office |
| Regulations | Fuse box, rewire and new circuits are notifiable under Part P. | GOV.UK |
What Exeter customers say
16 reviews“Turned up when they said, solar pv done and tested in 1–2 days. Price matched the quote.”
— Customer, High Street, Exeter · Sep 2026
How much does solar pv cost in Exeter?
Solar PV in Exeter typically costs £6,645, with most jobs between £4,885 and £9,285, based on illustrative local prices. Expect 1–2 days on site; the next local slot is in 3 days. Prices include testing and certificate.
How long does solar pv take in Exeter?
Usually 1–2 days on site. Larger homes or older wiring can add a day.
How soon can an electrician come out in Exeter?
The next available slot near EX1, EX2, EX3, EX4 is in 3 days. 48 electricians cover Exeter.
Is solar worth it in Exeter?
Devon gets some of the best sunshine in the UK, so yes for most south, east or west-facing roofs. A typical 4 kWp system in Exeter costs £6,645 and makes around 3,500 to 4,000 kWh a year. Most households see payback in 8 to 12 years, quicker with a battery.
Do you cover the villages round Exeter, like Heavitree and St Thomas?
We do. The solar pv prices on this page already include jobs in Heavitree, St Thomas, Pinhoe, Alphington, Pennsylvania, Whipton. Village visits are usually booked on the same days as Exeter work, so the next slot (in 3 days) normally applies to you too.
Who looks after the cable into my house in Exeter?
National Grid (South West) owns the supply cable, the main fuse and the cutout in EX1, EX2, EX3, EX4. Your electrician can't touch those. If the cutout is cracked, scorched or old, they'll report it, and National Grid (South West) usually replaces it free.
Do I need consent for solar pv in a listed building in Exeter?
If the work changes the building's character, yes, you need listed building consent from Exeter City Council. New cable routes through old plaster, visible kit on the front and roof panels are the usual triggers. Like-for-like repairs usually don't. Ask the conservation officer first; it's free.
Do I need planning permission for solar panels in Exeter?
Usually not, as roof panels are permitted development. You do need permission for listed buildings, and you may need it in conservation areas if panels face the road. Check with Exeter City Council first if your home is in either.
Which areas near Exeter do you cover for solar pv?
We list electricians working across Exeter and nearby spots like Heavitree and St Thomas, covering EX1, EX2, EX3, EX4. Homes here are mostly Victorian and Edwardian terraces, post-war estates and student lets. A typical job costs £6,645 on our illustrative local prices.
How do Exeter prices for solar pv compare with Topsham?
Exeter typically comes in at £6,645 and Topsham at £6,655, with Devon as a whole around £6,800. The gap is mostly down to property type and travel, so a quote from a firm in either town is worth having.
Can I get paid for the electricity I export?
Yes, through the Smart Export Guarantee. You'll need an MCS certificate from your installer and a smart meter. Rates vary a lot between suppliers, so shop around once the system's in.
How do I check an electrician is properly registered?
Look them up on the NICEIC, NAPIT or ELECSA register using their name or postcode, not just the logo on a van. Ask for their registration number and a copy of their insurance. A good electrician will happily send both before you book.
Who signs off solar pv work in Exeter?
Your electrician, if they're on a scheme like NICEIC. They test the work, issue an Electrical Installation Certificate and notify Exeter City Council building control. Hiring someone who isn't registered means paying the council to inspect it, which costs far more.
Who do I call in a power cut in Exeter?
National Grid (South West) runs the network here. If the whole street is dark, call 105, it's free and they'll give you a time. If it's only your house, check your trip switches first, then call an electrician.
- Battery storagefrom £3,420
- EV charger installationfrom £830
- Fuse box replacementfrom £440
- Illustrative prices refreshed for 2026.
- Added job map and price chart.
- Page first published.